Font
Large
Medium
Small
Night
Prev Index    Favorite Next

Chapter 1579 The surface is bright

Jiang Xiaoshan frowned and said, "Isn't it normal to reserve 50% of the profit? Isn't our projects like this?"

Wang Hongda said with a wry smile: "Mr. Jiang, do you know that leaving 50% of the profit means that we must reserve 14 million yuan of funds for this project as our profit. That is to say, the public relations cost plus the profit has occupied 20 million yuan, and the funds that can really be used for the entire project are only 8 million yuan. For this 8 million yuan, we have to pay the wages of workers for the dam renovation and construction materials costs. Mr. Jiang, think about it, we will take out 8 million yuan for the 28 million project to build. If we don’t cut corners in such a project, can we complete this project?"

After Wang Hongda finished speaking, Jiang Xiaoshan's face began to look a little ugly. At this moment, she had already vaguely realized that it might be too much for her to reserve 50% of the profit, which reminded her of the project in Shuixie Huadu. The reason why the large-scale building collapsed was due to cutting corners, and the root cause was because she asked to leave 50% of the profit. However, in fact, the profit of that project was as high as 70%.

Jiang Xiaoshan knew that she had overlooked a very critical factor, that is, the hearts of the people. It seems normal for her to reserve 50% of the profit, but this 50% is something she has to take from the company’s account, and the company also needs to make profits and also have to support a large number of people. If she wants to do this, how could Wang Hongda, the general manager of the company, not to find a way to reserve more profits? In other words, in addition to her own side, Wang Hongda may reserve 10% or even more profits. In this way, it would be good to have five million funds for actual construction.

Thinking of this, Jiang Xiaoshan's forehead began to sweat.

Jiang Xiaoshan's eyes fell on the chief engineer Chen Xiuwen. He knew that it would be useless to blame Wang Hongda now, because after all, this matter was because he was too greedy. Now, the only way is to find a way to remedy it and see if there is any way to pass Liu Qingyu's inspection.

"General Manager Chen, look, in three days, Mayor Liu Qingyu will go to the reservoir dam we are responsible for repairing. How can we pass Mayor Liu's inspection? As far as I know, Mayor Liu is a very serious and responsible official, and he is very serious, not afraid of the world. So, how can we do it to fool him seamlessly?" Jiang Xiaoshan asked.

Chen Xiuwen is a veteran water conservancy engineer. Jiang Xiaoshan was dug up from a water conservancy company under the Luming Water Conservancy Bureau for a high salary. He is also a water conservancy engineering expert. After hearing Jiang Xiaoshan’s question, he said in a deep voice: “Mr. Jiang, I have relevant information about the Deer Antler Dam in my laptop. Why don’t we go to my office to talk? I’ll explain it to you through the information.”

Jiang Xiaoshan nodded and followed Chen Xiuwen to his office. Chen Xiuwen opened his laptop and found a picture folder from it. He began to open the pictures one by one. These pictures were all close-ups of the reservoir dam. Through these close-ups, Chen Xiuwen introduced the renovation process of the entire reservoir dam like Jiang Xiaoshan. While explaining Chen Xiuwen, he pointed out: "Mr. Jiang, you see, because we lacked construction funds, we dared not buy and use good soil in the stage of ramming soil in the reservoir dam. We only transported various construction waste to stack it on the reservoir dam, and then covered it with a layer of good soil. We did not dare to compact this layer of good soil, because once it was compacted, it would increase the cost. Therefore, during the construction process, we just rammed it like a dragonfly.

Then when it comes to cement selection, we cannot use cement that meets the standards, because the cost is too high. In order to control the cost, we can only use inferior cement. These two factors, together, have led to a large number of cracks in the picture. According to my estimate, these cracks will increase with time. What I worry most is that once the flood season next year comes and is as big as this year, if the dam we renovates does not have so many people to protect at any time this year, only a wave of torrent will be needed, then our reservoir dam will be completely destroyed. At that time, we will be in trouble. So I suggest that after we find a way to fool Liu Qingyu's inspection and get the construction project payment, we must immediately cancel the company and register a new company again. Otherwise, our reservoir dam will show its true shape when the flood season next year."

Jiang Xiaoshan frowned and pointed at the huge cracks on the picture and said, "General Manager Chen, how do we deal with so many cracks and cracks on the reservoir dam? You know, there are only three days left for us now. Can we fool Liu Qingyu?"

Chen Xiuwen smiled and said, "Mr. Jiang, don't worry about this. If Liu Qingyu inspected next spring, I would not be sure to fool him. But at this time, it was not long before our entire project was over, and I would still be confident that I would fool him."

Jiang Xiaoshan widened her eyes and looked at Chen Xiuwen with an incredible look: "What should I do?"

Chen Xiuwen pointed to the picture on the computer screen with his finger and said with a smile: "This is very simple. For such small cracks, we only need to hire more workers. Each worker carries cement and trowels with better quality, and just add a little cement to smooth the cracks. There are no cracks in these cracks at all. As for those larger cracks, this is not complicated."

While speaking, Chen Xiuwen pointed to a huge crack on a picture on the computer screen that could accommodate one or two people, and said with a smug look on his face: "Although it is relatively troublesome to deal with such cracks, there are relatively mature methods. These are some common methods for water conservancy engineering construction."

While speaking, Chen Xiuwen pulled out some information from the computer and said, "Mr. Jiang, for these cracks, we only need to prepare some used wooden boards and some solid plastic boards according to what is written on these data. Aren't these cracks relatively deep? We can insert these discarded wooden boards and sticks into the soil as pile feet, and then lay a piece of plastic board with a shape similar to the cracks. This point can be used by workers to process the dam, and then apply a layer of high-quality cement three or four centimeters thick on the plastic board. As long as the cement is dried, the huge crack will not be different from other normal places even if someone stands on it, because plastic The material plates and wooden piles are enough to carry the weight of three to four people. The designer used the principles of mechanics to ensure that there was no problem. In addition, there was a layer of three or four centimeters thick cement on it. Even if the awesome expert came here, if he couldn't see the original appearance of the crack, he wouldn't be able to find something strange. However, the only troublesome thing for us is that the time is tight. If the cement cannot be dried in a short time after it is applied, I am afraid that when Liu Qingyu inspects, the cement we just applied will be inconsistent with the color of the cement that had already solidified around it. If Liu Qingyu is more careful, he may find something strange."

Hearing Chen Xiuwen say this, Jiang Xiaoshan's face became solemn and she asked: "General Manager Chen, then do we have any way to solve this problem?"

Chen Xiuwen pondered for a while and said with a solemn expression: "There is no good way, but one thing must be done, that is, we must find a way to apply cement in all places in the shortest time, and then let the cement be as much as possible with the sun. If it really doesn't work, we can prepare some fans or large hot hair dryers these days, blow them in places with larger cracks, and try to ensure that the places with large cracks look more consistent with the surrounding areas. It is necessary to ensure that when Liu Qingyu steps on these places, the cement will be hard, instead of one foot down a pit. It will be a real trouble at that time, but if you do this, you may need a lot of manpower and funds."

Jiang Xiaoshan waved her hand and said, "Manpower and funds are not a problem. You can just watch this matter, but these people must keep it confidential."

Wang Hongda hurriedly said: "Don't worry about keeping confidentiality for Mr. Jiang. During the construction period, I will temporarily keep all communication tools for them by mobile phones until Liu Qingyu's inspection is over, so that they cannot communicate with the outside world. At the same time, warn them not to leak the secrets. After Liu Qingyu's inspection is over, and after our project payment is cancelled, no matter how much they leak the secrets, it will be fine."

After hearing the two of them cooperated with each other, Jiang Xiaoshan nodded with satisfaction: "Okay, let's leave this matter to you both. After the project payment is settled, your bonus for this project will double."

After hearing this, the two of them immediately lit up. If the bonus doubled, each of them could earn at least 100,000 yuan more. That would be 100,000 yuan, not a small amount. For the double bonus, the two decided to fight.

After leaving Chen Xiuwen's office, Jiang Xiaoshan couldn't help but feel proud: "Liu Qingyu, Liu Qingyu, you have your Zhang Liang plan, I have my ladder, if you want to inspect, I will hide it from the world, hehe, see if we are one step higher or one step higher."
Chapter completed!
Prev Index    Favorite Next